bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Replacing Timing Chain (N52)|Page 368 > < 4 RA Replacing Timing Chain (N52)|Page 366
Page 3
background image

Release screw (1) on chain drive at top.

Tightening torque: 11 31 2AZ

.

Release screw (1) on chain drive at bottom.

Tightening torque: 11 31 3AZ

.

Remove both adjusting units.

Release screws (1).

Tightening torque: 11 31 2AZ

.

Remove timing chain module with timing chain and sprocket
wheel upwards in direction of arrow.

Important!

Note installation direction of sprocket wheel (2).

Collar (see arrow) on sprocket wheel (2) points to  crankshaft
.

Incorrect assembly will result in engine damage.

RA  Replacing timing chain (N52)

BMW AG - TIS

27.01.2013  20:07

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

4 RA Replacing Timing Chain (N52)|Page 368 > < 4 RA Replacing Timing Chain (N52)|Page 366