5 Series E60 523Li (N52) SAL
Release fuel rail (2) and lay to one side.
Note:
Do not detach fuel line.
Release screw (1).
Unscrew nuts (3).
Tightening torque: 11 61 1AZ
.
Raise intake manifold approx. 10 cm.
Disconnect plug connection (1) at bottom.
Release tank vent line behind throttle valve assembly.
Installation:
Replace all seals.
Assemble engine.
RA Removing and installing intake air manifold (N52)
BMW AG - TIS
05.02.2013 18:26
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -