5 Series E60 523Li (N52) SAL
Necessary preliminary tasks:
•
Draw off and dispose of hydraulic fluid from fluid reservoir
•
Remove front underbody protection
•
Remove intake filter housing
•
Remove belt pulley
Release screws (1).
Installation:
Replace aluminium screws.
Observe screwing sequence.
N52:
Release hose clamp (1) and detach suction line (2) from vane
pump.
Installation:
Markings on suction line and vane pump connection must match
up.
Release banjo bolt (4) and detach pressure line (3) from vane
pump.
Installation:
Replace all sealing rings.
Make sure pressure line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 3AZ
.
RA Removing and installing (replacing) power steering vane pump (N52, N53)
BMW AG - TIS
05.02.2013 21:37
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -