5 Series E60 525d (M57T2) SAL
Tightening specifications for main bearing:
1.
Tighten all screws on main bearing cover with jointing torque.
2.
Unfasten screws on main bearing cover 6.
3.
Strike back and front of crankshaft with plastic hammer to
centre thrust bearing (do not damage crankshaft).
4.
Tighten screws of main bearing cover 6 with jointing torque.
5.
Tighten down all screws on main bearing caps with special
tool 00 9 120 to angle of rotation.
Tightening specification 11 11 1AZ
.
Check axial play.
Assemble engine.
RA Replacing crankshaft (M57T2)
BMW AG - TIS
09.02.2013 18:45
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -