bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Replacing Front Section Of Left Engine Support|Page 1412 > < 3 RA Replacing Front Section Of Left Engine Support|Page 1410
Page 4
background image

Installation:

Use 1 rivet (size 15) in area (1).

Open rivet joints in areas (1) and (2).

As a rule, part of the punch rivet remains in the rear engine carrier
in area (2). Do not drill out remnants. Set blind rivets next to
punch rivets.

Open weld joint in area (3).

Installation:

Use 2 rivets (size 13) in area (1).

Install 2 EMC screws in area (1).

Use 7 rivets (size 13) in area (2).

Apply as much adhesive in area (2) that the adhesive emerges
from the flange during riveting.

Spot-drill rivets in area (1) from protruding rear side or grind and
punch through.

Installation:

Use 2 rivets (size 13) in area (1).

Set rivets from inside.

Installation:

Use 6 rivets (size 13) in areas (1).

For reasons of accessibility, bond and rivet retaining brackets in
areas (1) to engine carrier first after adjusting to fit.

Bond in area (2) only. 

RA  Replacing front section of left engine support

BMW AG - TIS

11.02.2013  18:39

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

3 RA Replacing Front Section Of Left Engine Support|Page 1412 > < 3 RA Replacing Front Section Of Left Engine Support|Page 1410