bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

11 RA Removing And Installing_replacing Cooler Box Button (long Version)|Page 2628 > < 10 RA Removing And Installing_replacing Cooler Box Lid (long Version)
Page 1
background image

64 11 480

Removing and installing/replacing cooler box
button (long version)

Special tools required:

64 1 020

Necessary preliminary tasks:

Remove cooler box lid

Warning!

When working with adhesive cleaners in enclosed rooms:

Ensure room is well ventilated.

Important!

Observe the following when handling adhesive areas:

The adhesive areas must be dry and free from dust and
grease.

After cleaning, do not touch bonding area with bare hands.

RA  Removing and installing/replacing cooler box button (long version)

BMW AG - TIS

12.02.2013  04:47

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

11 RA Removing And Installing_replacing Cooler Box Button (long Version)|Page 2628 > < 10 RA Removing And Installing_replacing Cooler Box Lid (long Version)