bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Replacing Front Section Of Engine Support To Left Wheel Arch|Page 1434 > < 1 RA Replacing Front Section Of Engine Support To Left Wheel Arch|Page 1432
Page 4
background image

Open weld joints in areas (1).

Open weld joints in area (1).

Mark severance cut according to measurement a and cut inside
A-pillar.

Measurement a = 47 mm from centre of bore.

Note:

When replacing right wheel arch:

Measurement a = 65 mm from centre of bore.

Measurement b = 20 mm

Different riveting-down elements, depending on the equipment
specification, must be mounted on the new component.

Required tools are featured on the Workshop Equipment Planning
CD (WEP).

See also Aftersales Assistance Portal (ASAP) -
Service/Technology - Workshop Equipment (Start BMW) - Shop
Workshop Equipment

RA  Replacing front section of engine support to left wheel arch

BMW AG - TIS

20.02.2013  12:52

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

1 RA Replacing Front Section Of Engine Support To Left Wheel Arch|Page 1434 > < 1 RA Replacing Front Section Of Engine Support To Left Wheel Arch|Page 1432