5 Series E60 530d (M57T2) SAL
11 14 110
Removing and installing, sealing/replacing
front timing case cover (M57T2)
Special tools required:
•
11 3 340
Necessary preliminary tasks:
•
Remove engine
•
Remove cylinder head.
•
Remove oil sump
•
Remove vibration damper
•
Replace crankshaft radial seal
Important!
Protect alternator against engine oil.
Cover alternator with suitable apparatus.
(Risk of damage).
Assemble charge air hoses without grease and dry.
Release screws.
Remove timing-chain cover.
RA Removing and installing, sealing/replacing front timing case cover (M57T2)
BMW AG - TIS
21.02.2013 11:11
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -