5 Series E60 530d (M57T2) SAL
Make sure pressure line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 3AZ
.
Release bolts (1-3).
Lift out vane pump.
Installation:
Insert screws (1 - 3).
Tighten down bolts (1, 2).
Tightening torque 32 41 1AZ
.
Tighten screw (3).
Tightening torque 32 41 1AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Removing and installing vane pump for power steering (M57TU, M57T2)
BMW AG - TIS
21.02.2013 16:04
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -