bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Removing And Installing_replacing Intercooler (N54)|Page 699 > < 2 RA Removing And Installing_replacing Oil Line For Engine Oil Cooler (N54)|Page 696
Page 1
background image

17 51 000

Removing and installing/replacing intercooler
(N54)

Special tools required:

11 8 670

Necessary preliminary tasks:

Remove front underbody protection

Unlock charge-air duct on left and right of intercooler and

detach

Important!

Coat sealing rings of quick-connect couplings with antiseize
agent.

Pressure pipes cannot be fitted without antiseize agent.

Release screws. (Picture shows right side).

Open quick-connect couplings on charge-air hoses.

Remove intercooler.

RA  Removing and installing/replacing intercooler (N54)

BMW AG - TIS

22.02.2013  03:19

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Removing And Installing_replacing Intercooler (N54)|Page 699 > < 2 RA Removing And Installing_replacing Oil Line For Engine Oil Cooler (N54)|Page 696