bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

12 RA Installing Replacement Transmission (GS6-53BZ) (S85) > < 11 RA Removing And Installing Transmission (GS6-53BZ) (S85)|Page 757
Page 6
background image

Release remaining eight bolts (1/2).

Important!

Bolts (2) are longer than bolts (1)

Tightening torque 23 00 1AZ

.

Note:

Bolt (3) must not be released.

Bolt (3) serves to secure the starter motor.

Important!

Do not suspend the transmission from the transmission input
shaft during removal and installation as this will deform the
clutch plate. Pull out transmission towards rear and remove.

Installation:

Check that adapter sleeves (1) are correctly seated.

Replace damaged dowel sleeves.

Note:

When removing and installing the transmission, without fail use
the transmission bracket 23 4 050  and a jack to support the
engine.

Failure to comply with this instruction may result in preliminary
damage to the clutch and splined shaft.

Installation:

Check lubrication of transmission input shaft for sticky
consistency. If grease is sticky, clean input shaft and replace
clutch plate.

Check clutch plate for friction rust in splines and replace if
necessary.

Remove any grease and lining abrasion from splines of clutch
plate by mechanical means (with a cloth).

Installation:

Greasing specification:

Remove and clean release bearing and release lever.

Push on grease scraper ring 21 2 240  as far as it will go.

Grease splines (1) of input shaft with a brush.  Refer to BMW

Service Operating Fluids.

Detach grease scraper ring.

RA  Removing and installing transmission (GS6-53BZ) (S85)

BMW AG - TIS

22.02.2013  18:45

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 6 -

12 RA Installing Replacement Transmission (GS6-53BZ) (S85) > < 11 RA Removing And Installing Transmission (GS6-53BZ) (S85)|Page 757