bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

6 RA Partial Replacement, Bulkhead, Left (engine Carrier Front Section Removed) > < 5 RA Replacing Left Support Carrier|Page 1426
Page 4
background image

Installation:

Seal cutting line and rivets with sprayable body sealing compound
(sourcing reference: BMW Parts Service).

Spray gun required for body sealing compound (order no.
81 49 0 300 887).

Different riveting-down elements, depending on the equipment
specification, must be mounted on the new component.

Required tools are featured on the Workshop Equipment Planning
CD (WEP).

See also Aftersales Assistance Portal (ASAP) -
Service/Technology - Workshop Equipment (Start BMW) - Shop
Workshop Equipment

RA  Replacing left support carrier

BMW AG - TIS

05.02.2013  08:43

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

6 RA Partial Replacement, Bulkhead, Left (engine Carrier Front Section Removed) > < 5 RA Replacing Left Support Carrier|Page 1426