5 Series E61 525d (M57TU) TOUR
Installation:
Check lubrication of transmission input shaft for sticky
consistency. If grease is sticky, clean input shaft and replace
clutch plate.
Check clutch plate for friction rust in splines and replace if
necessary.
Mechanically remove existing grease and lining abrasion from
splines of clutch plate (with a cloth).
Installation:
Greasing specification:
-
Remove and clean release bearing and release lever.
-
Push on grease scraper ring 21 2 240 as far as it will go.
-
Grease splines (1) of input shaft with a brush. Refer to BMW
Service Operating Fluids.
-
Detach grease scraper ring.
RA Removing and installing transmission (GS6-53DZ/ M57TU)
BMW AG - TIS
11.02.2013 09:31
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -