bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing Wiring Harness Section For Engine (M57TU)|Page 486 > < 2 RA Replacing Wiring Harness Section For Engine (M57TU)|Page 484
Page 3
background image

17

Plug connection, changeover valve (EGR)

23

Plug connection, term.50 starter motor

18

Plug connection, coolant temperature sensor

24

Plug connection, oil pressure switch

19

Plug connection, high-pressure control valve

25

Plug connection, fuel temperature sensor

20

Plug connection, solenoid valve (engine mount)

26

Plug connection, bus line (alternator-DME)

21

Plug connection, solenoid valve (swirl flap)

27

Plug connection, high-pressure pump

22

Plug connection, boost pressure sensor

Disconnect plug connection (1).

Release nuts (2) and convert pressure transducer to new wiring
harness.

Release lock (3).

Pull out changeover valve (4) towards top and convert to new
wiring harness. 

Release nuts (5) and convert preheater control unit to new wiring
harness. 

Release screws (6).

RA  Replacing wiring harness section for engine (M57TU)

BMW AG - TIS

18.02.2013  02:29

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

2 RA Replacing Wiring Harness Section For Engine (M57TU)|Page 486 > < 2 RA Replacing Wiring Harness Section For Engine (M57TU)|Page 484