5 Series E61 535d (M57TU) TOUR
Remove front underbody protection.
Remove steering gear cover at side.
Expose pressure line up to connection on power steering gear.
Release banjo bolt and disconnect pressure line.
Installation:
Replace all sealing rings.
Make sure hydraulic line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 3AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Replacing pressure line for power steering (M47T2, M57TU, M57T2)
BMW AG - TIS
19.02.2013 03:31
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -