5 Series E61 535xi (N54) TOUR
Release and remove bearing pins (1) in direction of arrow.
Lift out shift arm (1).
Installation:
Grease bearing pins (1).
Grease,
Refer to BMW Service Operating Fluids.
Release screws.
Installation:
Tightening torque, steel screws 23 00 1AZ
.
Tightening torque, aluminium screws 23 00 2AZ
. Screws:
3/4/5/9/10 (screw 3 only present on N54).
Important!
Do not allow the transmission to hang off from the
transmission input shaft as this will deform the clutch plate.
Pull out transmission towards rear and remove.
Installation:
Secure angle of rotation special tool 00 9 120 with magnet
00 9 130 to floor plate. Screw down aluminium screws according
to angle of rotation. Angle of rotation 23 00 2AZ
.
RA Removing and installing transmission (GS6-53DZ) N54 AWD
BMW AG - TIS
19.02.2013 09:42
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -