6 Series 630i (N52K) Coupe
33 32 051
Removing and installing/replacing left or right
push rod/integral link
Note:
If the integral link is detached from the wheel carrier or swinging
arm, it is necessary after reinstallation to carry out a wheel/chassis
alignment check.
Necessary preliminary tasks:
•
Remove rear wheel.
•
E61: Deactivate and empty air spring system
•
Remove output shaft from rear differential
Support wheel carrier with workshop jack.
Release nut (1) and remove screw.
Release screw (2), press swinging arm downward and remove
integral link (3).
Installation:
Replace self-locking nut.
First install swinging arm hand-tight, then tighten down screw (2).
Tighten screw/bolt connections in normal position.
Tightening torque (nut) 33 32 22AZ
.
Tightening torque (bolt) 33 32 21AZ
.
RA Removing and installing/replacing left or right push rod/integral link
BMW AG - TIS
16.01.2013 16:58
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -