6 Series 635d (M57T2) Coupe
Release bolts (1) with special tool 11 6 050 .
Tightening torque 11 65 2AZ
.
Remove L.P. turbocharger downwards.
Installation:
Clean sealing surfaces and replace seal.
To avoid damaging the threads and prevent turbocharger leakage,
insert retaining screws in 1/2 turns simultaneously.
Adjust turbine control flap.
Assemble engine.
RA Removing and installing / replacing low-pressure turbocharger (large turbocharge
BMW AG - TIS
21.01.2013 21:55
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -