6 Series 635d (M57T2) Coupe
Tightening torque 32 41 3AZ
.
Expose pressure line up to connection on steering gear.
Release banjo bolt (1) and remove pressure line (2).
Installation:
Replace all sealing rings.
Make sure pressure line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 3AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Replacing pressure line for power steering (M57T2)
BMW AG - TIS
22.01.2013 00:00
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -