bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

9 RA Removing And Installing Transmission (GS6-53BZ) N62_N62TU|Page 878 > < 9 RA Removing And Installing Transmission (GS6-53BZ) N62_N62TU|Page 876
Page 5
background image

Lift out shift arm (1).

Installation:

Grease bearing pins (1).

Grease,

refer to BMW Service Operating Fluids.

Release screws.

Tightening torque  23 00 1AZ

.

Important!

Do not allow the transmission to hang off from the
transmission input shaft as this will deform the clutch plate.
Pull out transmission towards rear and remove.

Installation:

Check that dowel sleeves are correctly seated.

Replace damaged dowel sleeves.

Installation:

Check lubrication of transmission input shaft for sticky
consistency. If grease is sticky, clean input shaft and replace
clutch plate.

Check clutch plate for friction rust in splines and replace if
necessary.

Mechanically remove existing grease and lining abrasion from
splines of clutch plate (with a cloth).

RA  Removing and installing transmission (GS6-53BZ) N62/N62TU

BMW AG - TIS

18.01.2013  22:42

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 5 -

9 RA Removing And Installing Transmission (GS6-53BZ) N62_N62TU|Page 878 > < 9 RA Removing And Installing Transmission (GS6-53BZ) N62_N62TU|Page 876