6 Series E64 630i (N53) CONVER
Necessary preliminary tasks:
•
Disconnect all necessary cable ties on support tube.
•
Release wiring harnesses/cable ducts and lay to one side.
•
If necessary, remove control units/disconnect plug
connections.
Installation:
Make sure wiring harnesses/cable ducts are correctly routed and
secured.
If necessary, remove CD changer (1) .
Release screws (2).
Set fuse-carrier (3) down in footwell.
Feed out footwell heater ducts (1) and remove.
Release screws (2), tightening torque 51 71 15AZ
.
Release screws (3), tightening torque 32 31 6AZ
.
Release nuts (4), tightening torque 51 71 15AZ
.
RA Removing and installing or replacing heater
BMW AG - TIS
02.02.2013 16:25
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -