bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

9 RA Removing And Installing Transmission (GS6-53BZ) N62_N62TU|Page 1026 > < 8 RA Overview Of Transmission Housing (GS6-37_53BZ_DZ)
Page 1
background image

23 00 018

Removing and installing transmission (GS6-
53BZ) N62/N62TU

Special tools required:

00 2 030

21 2 240

23 0 132

23 4 050

Important!

After completion of work, check gearbox oil level.

Use only the approved transmission oil.

Failure to comply with this requirement will result in serious
damage to the manual transmission.

Necessary preliminary tasks:

Disconnect battery.

Remove reinforcement plate.

Remove exhaust system after catalytic converter.

Remove oxygen sensors.

Remove heat shields (1) and (2).

RA  Removing and installing transmission (GS6-53BZ) N62/N62TU

BMW AG - TIS

04.02.2013  06:46

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

9 RA Removing And Installing Transmission (GS6-53BZ) N62_N62TU|Page 1026 > < 8 RA Overview Of Transmission Housing (GS6-37_53BZ_DZ)