bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing All Main Crankshaft Bearing Shells (M57)|Page 573 > < 1 RA Replacing Crankshaft (M57)|Page 571
Page 1
background image

11 21 531

Replacing all main crankshaft bearing shells
(M57)

Special tools required:

00 2 590

00 9 120

11 2 110

(engine dismantled)

Caution!

Observe grinding stage of crankshaft.

Installation:

When exchanging bearing shells (also exchange
crankshafts), classification of bearing shell allocation in the
crankcase is discontinued.

Only fit yellow bearing shells into the crankcase.

RA  Replacing all main crankshaft bearing shells (M57)

BMW AG - TIS

03.02.2013  03:57

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

2 RA Replacing All Main Crankshaft Bearing Shells (M57)|Page 573 > < 1 RA Replacing Crankshaft (M57)|Page 571