7 Series E65 740d (M67) SAL
Installation note:
After installing intake air manifold, finally tighten down
clamps (1).
Tightening torque 11 71 1AZ
.
RA Removing and installing/replacing exhaust gas recirculation cooler (EGR cooler)
BMW AG - TIS
09.02.2013 14:37
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -