7 Series E65 740d (M67) SAL
Checking function of cap:
Screw sealing cap onto special tool 17 0 106 .
Pressure relief valve must open between 1.65 and 2.2 bar.
Build up pressure with special tool 17 0 101 and watch
pressure gauge to ascertain when opening pressure is reached.
Note down measured opening pressure.
After a waiting period of approx. 30 seconds, the pressure must
no longer drop by more than 0.4 bar below the measured
opening pressure.
RA Checking cooling system for water leaks (M67, M67TU, M57T2)
BMW AG - TIS
09.02.2013 16:02
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -