7 Series E65 740d (M67) SAL
Unscrew nuts (1).
Release nuts (2) and remove catalytic converter.
Connect new catalytic converter to center muffler by means of
clamping sleeves.
Installation:
Align clamping sleeves so that:
•
Nuts point downwards.
•
Cutting line is in middle of clamping sleeve.
•
There is sufficient spacing to adjoining components.
RA Removing and installing/replacing catalytic converter (M67)
BMW AG - TIS
09.02.2013 16:19
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -