7 Series E65 740d (M67) SAL
Unscrew nut (1).
Installation:
Replace self-locking nut.
Tightening torque, 32 41 6AZ
.
Release banjo bolt and disconnect Dynamic Drive pressure
line (2) with bracket from power steering pump.
Installation:
Replace all sealing rings (D).
Make sure hydraulic lines are laid without tension and with
sufficient spacing to adjoining components.
Tightening torque 32 41 3AZ
.
Release hose clamp and detach suction line (1) from power
steering pump.
Installation:
Align suction line (1) by way of marking to connection on power
steering pump.
Release banjo bolt and disconnect power steering pressure
line (2) from power steering pump.
Installation:
Replace all sealing rings (D).
Make sure hydraulic lines are laid without tension and with
sufficient spacing to adjoining components.
Tightening torque 32 41 3AZ
.
Release screw (1).
Tightening torque 32 41 1AZ
.
Unscrew nuts (2).
Remove power steering pump.
Installation:
Replace self-locking nuts.
Tightening torque 32 41 1AZ
.
RA Removing and installing power steering pump for power steering gear with Dynamic
BMW AG - TIS
09.02.2013 19:00
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -