bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

25 RA Removing And Installing_replacing Cooler Box Button|Page 2351 > < 24 RA Removing And Installing_replacing Cooler Box Lid
Page 1
background image

64 11 480

Removing and installing/replacing cooler box
button

Special tools required:

64 1 020

Necessary preliminary tasks:

Remove cooler box lid

Warning!

When working with adhesive cleaners in enclosed rooms:

Ensure room is well ventilated.

Important!

Observe the following when handling adhesive areas:

The adhesive areas must be dry and free from dust and
grease.

After cleaning, do not touch bonding area with bare hands.

RA  Removing and installing/replacing cooler box button

BMW AG - TIS

05.02.2013  23:44

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

25 RA Removing And Installing_replacing Cooler Box Button|Page 2351 > < 24 RA Removing And Installing_replacing Cooler Box Lid