7 Series E66 730Li (N52) SAL
Release hose clamp and detach suction line (1) from vane pump.
Installation:
Align suction line (1) by way of marking to connection on vane
pump.
Release banjo bolt and disconnect pressure line (2) from vane
pump.
Installation:
Replace all sealing rings.
Make sure hydraulic lines are laid without tension and with
sufficient spacing to adjoining components.
Tightening torque 32 41 3AZ
.
Release screw (3).
Installation:
Replace aluminium screw.
Observe screwing sequence.
Release screws (1).
Remove vane pump (2).
Installation:
Replace aluminium screws.
Observe screwing sequence.
Screw-fastening sequence:
1.
Secure vane pump with screws
2.
Tighten front screws to 2 Nm
3.
Tighten side screw to 2 Nm
4.
Tighten down front screws to jointing torque and angle of
rotation
Tightening torque 32 41 1AZ
.
5.
Tighten down side screw to jointing torque and angle of
rotation
Tightening torque 32 41 1AZ
.
RA Removing and installing vane pump for power steering (N52)
BMW AG - TIS
07.02.2013 02:02
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -