7 Series E66 750Li (N62TU) SAL
11 22 000
Removing and installing/replacing flywheel
(N62/N62TU)
Special tools required:
•
11 4 180
•
11 9 260
•
11 9 262
•
11 9 263
•
11 9 264
Necessary preliminary tasks:
•
Remove automatic transmission.
•
Remove manual transmission.
•
Remove clutch.
Automatic transmissions only:
Block flywheel (1) with special tools 11 9 260 / 11 9 263
/
11 9 264 .
Unfasten flywheel screws.
Remove flywheel (1).
Installation:
Clean threads on flywheel screws in crankshaft.
Flywheel (1) is secured with an alignment pin.
Fit flywheel (1).
Fit new flywheel screws.
Tightening torque 11 22 1AZ
.
RA Removing and installing/replacing flywheel (N62/N62TU)
BMW AG - TIS
12.02.2013 13:47
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -