X Series E53 X5 3.0d (M57TU) OFFRD
Insert special tool 25 1 100 into mounting.
Turn special tool 25 1 100 , 90
°
counterclockwise.
Press mount upwards out of selector arm.
Remove rubber gaiter from body cutout and lift out with selector
lever.
Installation:
Pull inner rubber gaiter over pot on selector arm.
Install outer rubber gaiter into body cutout.
Installation:
Insert rubber gaiter with arrow pointing forwards in direction of
travel.
RA Removing and installing shift lever
BMW AG - TIS
05.02.2013 04:43
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -