X Series E70 X5 3.0Sd (M57T2) OFFRD
Open weld joints in area (1).
Mark severance cut (1) in accordance with measurement a and
cut engine carrier.
Measurement a=50 mm before 20 mm dia. bore
Open weld joints in area (2).
Installation:
Weld in reinforcement plate at severance cut.
Open weld joints in area (1).
Drill out riveted joints in area (2).
Open adhesive joints in areas (2) and (3).
Installation:
Use 19 rivets (size 815) in area (1).
Use 4 rivets (size 815) in area (2).
RA Replacing engine carrier with wheel arch, left
BMW AG - TIS
05.02.2013 10:33
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -