X Series E70 X5 3.0Sd (M57T2) OFFRD
After installing the new compressor, it is essential before filling the
A/C system to pour the same amount of the previously drawn off
refrigerant oil into the system again,
refer to Evacuating A/C system.
Installation:
If A/C system is opened for more than 24 hours: Replace drier
bottle/drier insert.
RA Instructions for compressor replacement
BMW AG - TIS
05.02.2013 17:44
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -