bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Replacing Front Left Engine Carrier|Page 1439 > < 3 RA Replacing Front Left Engine Carrier
Page 2
background image

Open weld joints in areas (1).

Open weld joints in areas (1).

Open weld joints in areas (1).

Mark severance cut (1) in accordance with measurements a and
b and cut bulkhead support carrier.

Measurement a=95 mm

Measurement a=120 mm

Open weld joints in area (2).

RA  Replacing front left engine carrier

BMW AG - TIS

08.02.2013  09:59

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

3 RA Replacing Front Left Engine Carrier|Page 1439 > < 3 RA Replacing Front Left Engine Carrier