X Series E83 X3 2.5i (M54) OFFRD
Lever out covers (1) and remove.
Unfasten screws (2).
Lift out rail (3).
Important!
Do not kink floor panelling under any circumstances!
Cut and fold back floor panelling (1) in area (2).
Installation:
Cut into floor panelling (2) at marked points. Join cutting lines
with cable straps (short).
Unlock cable lug mounting (1) and fold back.
Release screw (2), tightening torque 61 12 2AZ
.
Unclip cable lug mounting (1) from positive battery cable (3) and
remove.
Warning!
Risk of short circuits!
When installing, ensure:
•
Correct seating of cable lug mounting (1) on positive
battery cable (3)
•
Correct screw connection
RA Replacing battery positive lead (from battery to engine compartment partition co
BMW AG - TIS
10.02.2013 04:16
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -