bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

5 RA Removing And Installing _ Replacing Control Unit For Transfer Case > < 3 RA Installing Replacement Transfer Case (ATC 400 X-Drive)|Page 788
Page 1
background image

27 10 050

Replacing output flange for front axle output
(ATC 400/500 X-Drive)

Important!

Do not move vehicle with engine power once propeller shaft
has been removed.

Replace output flange only in conjunction with a new radial
shaft seal.

After completion of work, check transmission oil level.

Use only approved transmission oil.

Failure to comply with this requirement will result in serious
damage to the transfer box!

Operation is identical to Replacing radial shaft seal for front axle
output.

RA  Replacing output flange for front axle output (ATC 400/500 X-Drive)

BMW AG - TIS

11.02.2013  11:30

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

5 RA Removing And Installing _ Replacing Control Unit For Transfer Case > < 3 RA Installing Replacement Transfer Case (ATC 400 X-Drive)|Page 788