X Series E83 X3 2.5Si (N52K) OFFRD
Release hose clamp (1) and detach suction line (2) from vane
pump.
Installation:
Align suction line by way of marking to connection on vane pump.
Release bolts (1).
Installation:
Replace aluminium screws.
Observe screwing sequence.
Remove front underbody protection.
Release banjo bolt (1) and disconnect pressure line.
Installation:
Replace sealing ring.
Make sure pressure line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 3AZ
.
Release screws (2) and remove vane pump towards top.
Installation:
Replace aluminium screws.
Observe screwing sequence.
Screw-fastening sequence:
1.
Secure vane pump with screws
2.
Tighten side screws to 2 Nm
3.
Tighten front screws to 2 Nm
4.
Tighten down front screws to jointing torque and angle of
rotation
Tightening torque 32 41 1AZ
.
5.
Release screws at side and check screw fastening points for
gap freedom
RA Removing and installing/replacing power steering vane pump (N52)
BMW AG - TIS
11.02.2013 13:03
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -