bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Removing And Installing_replacing Battery Positive Lead Between Starter Motor An > < 2 RA Replacing Solenoid Switch
Page 1
background image

12 42 530

Battery positive lead (starter motor/alternator
M57TU, M57T2)

Necessary preliminary tasks:

Read fault memory.

Switch off ignition

Disconnect battery negative lead

Slacken nut (1).

Installation:

Tightening torque 12 31 1AZ

.

Lay line (2) to one side.

Unscrew nut (3).

Installation:

Tightening torque 12 31 1AZ

.

Disconnect battery positive lead (4).

Note:

Now clear the fault memory.

RA  Battery positive lead (starter motor/alternator M57TU, M57T2)

BMW AG - TIS

14.02.2013  22:00

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

2 RA Removing And Installing_replacing Battery Positive Lead Between Starter Motor An > < 2 RA Replacing Solenoid Switch