X Series E83 X3 3.0Si (N52K) OFFRD
Installation:
All contact surfaces (1) of guide block must be clean and free
from oil and grease. If necessary, clean contact surfaces (1).
Lift out intermediate levers (2).
Place all intermediate levers (2) in neat order in special tool
11 4 481 .
Installation:
Mixing up the intermediate levers (2) will cause the engine to
suffer idle-speed fluctuations.
Installation:
All contact surfaces (1) must be clean and free from oil and
grease. If necessary, clean contact surfaces (1).
All intermediate levers (1) are classified.
All intermediate levers (1) must be reinstalled in the same
positions in an engine which has already been in use.
Important!
Before installing intermediate levers (2), make sure cam
followers are correctly positioned.
Risk of damage!
Install intermediate levers (2).
RA Removing and installing/replacing intermediate levers (N52K)
BMW AG - TIS
21.02.2013 03:57
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -