bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Replacing Engine Carrier With Wheel Arch, Left|Page 1403 > < 3 RA Replacing Engine Carrier With Wheel Arch, Left
Page 2
background image

Open weld joints in areas (1).

Open weld joints in areas (1).

Installation:

Weld new component in area (2) additionally.

Open weld joints in areas (1).

Open weld joints in areas (1).

RA  Replacing engine carrier with wheel arch, left

BMW AG - TIS

21.02.2013  11:27

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

3 RA Replacing Engine Carrier With Wheel Arch, Left|Page 1403 > < 3 RA Replacing Engine Carrier With Wheel Arch, Left