Z Series E52 Z8 (S62) ROADST
Cylinder bank 1 to 4:
Note:
Use special tool 11 7 200 to tighten down bolts on VANOS
gear.
Tighten down six accessible screws (three on exhaust side and
three on inlet side) on VANOS gear to 10 Nm.
Cylinder bank 1 to 4:
Remove special tool 11 7 120 .
Remove special tool 11 2 300 . Crank engine at central bolt in
direction of rotation a further revolution up to overlap TDC
position.
Cylinder bank 1 to 4:
Note:
Use special tool 11 7 200 to tighten down bolts on VANOS
gear.
Tighten down remaining six bolts on VANOS gear to 10 Nm.
RA Removing and installing right cylinder head (S62)
BMW AG - TIS
06.02.2013 22:09
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 18 -