Z Series E85 M roadst (S54) ROADST
Adjusting throttle assemblies 3, 4, 5 and 6:
To adjust throttle assemblies 3, 4, 5 and 6, follow the same
procedure as for adjusting throttle assembly 2. Carry out
adjustment of throttle assemblies 3, 4, 5 and 6 in sequence.
Carry out checking of basic throttle setting.
If necessary, carry out adjustment of basic throttle setting again.
Adjusting full-load stop:
Activate servomotor via DIS Tester or MoDiC until throttles are
fully open and stop screw (1) rests on detent lug.
Follow instructions featured in DIS Tester or MoDiC.
Carry out measurement at throttle of first throttle assembly
(cylinder 1).
Adjust measurement (A) = 24.66 mm
±
0.2 mm by turning
stop screw.
Activate servomotor several times and check whether
measurement (A) is in tolerance range.
Caution!
After working on throttle system (throttle assembly,
servomotor, potentiometer), carry out electronic throttle test
with DIS Tester or MoDiC without fail:
-
Service functions
-
DME system checks
-
Function test
RA Adjusting basic throttle setting (S54)
BMW AG - TIS
06.02.2013 21:41
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -