Z Series E85 Z4 2.0i (N46) ROADST
Important!
The larger diameters of bores (2) in the bracket must point to
the engine carrier.
Make sure there is a positive lock (1) between rubber mount
bushing and control arm pin.
Coat control arm pin and rubber mount bushing with soap water.
Mixture ratio: 1 part soap to 20 parts water.
Attach special tool 31 2 153 with extensions (1) to control arm
opening.
Install new bracket with special tools 00 7 500 , 31 2 152 ,
31 2 154 and 31 2 157 on control arm pin up to marking.
Relieve tension on special tool. Check position of rubber mount to
marking and correct if necessary.
After installation:
•
Check freedom of movement of other components to bracket
for control arm
RA Replacing both control arm brackets
BMW AG - TIS
08.02.2013 08:11
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -