Z Series E85 Z4 2.0i (N46) ROADST
Installation:
Line 12 or 14 at upper connection (clip).
Line 11 or 13 at lower connection (plate).
Pay attention to routing of lines:
•
Left (A):
Secure opposite each other with 2 cable ties (K)
•
Right (B):
First secure opposite each other with 2 cable ties (K), then
feed upper line with a loop (x = 100 cm) upwards again.
Installation:
Make sure lines are completely inserted into cylinder. The edge of
the line bead (1) must be below the cylinder edge (2).
Make sure the clip (3) or the plate (4) is correctly seated on the
connections.
For right hydraulic lines only:
Release screws in area (1) on sealing frame.
Feed lines out of cable holder.
RA Removing and installing/replacing all hydraulic lines on convertible top
BMW AG - TIS
08.02.2013 14:23
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -