Z Series E85 Z4 2.5i (N52) ROADST
•
The locking element must be locked in the lowered position after three complete
closing and opening operations.
4. Correct position of left main pillar
Adjusting screws (1)
Main pillar (2)
Remedy:
•
Remove cover over adjusting screws (1).
•
Attention!
Do not undo adjusting screws!
Release adjusting screw (1) by approx. 2 turns and push left main pillar (2) downward
(direction of arrow) by approx. 1 to 2 mm.
•
Tighten adjusting screws (1) - tightening torque 18 Nm.
•
Clip on cover over adjusting screws.
•
Check alignment of support bracket with respect to the X-hooks.
•
The locking element must be locked in the lowered position after three complete
closing and opening operations.
Reimbursement:
Material and labour costs incurred can be claimed through the usual warranty channels
subject to current warranty terms.
Defect code
54 31 90 45 00
This defect code is not contained in the official
Defect Code Catalogue but has been included in
the system, This will enable warranty claims to be
processed.
Without additional repair order:
Corrective measures on convertible top:
- Checking material folding and correcting if
necessary:
- Checking clearance of main link/roof frame link
- Checking position of X-hooks and correcting if
necessary
-Correcting position of left main pillar
Job number
00 55 258
Labour
19 FRU
SI Convertible top does not fold down E85
BMW AG - TIS
12.02.2013 01:54
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -