Z Series E85 Z4 2.5Si (N52) ROADST
Note:
Prepare wire (1) - max. 2 mm dia. and approx. 60 mm long -
as illustrated.
Push in locking rods (2 and 3) as far as they will go.
Block locking rod (3) with wire (1).
Release screws (1) and unclip lock fastener (2) in upwards
direction.
Installation:
Feed lock fastener (1) into glovebox (2).
Insert screws (3) and tighten down
Pull out locking pin (4).
Note:
After being installed, actuating unit (2) cannot be removed
without incurring damage.
Push in locking rod (1) slightly.
Clip in actuating unit (2) on glovebox (3).
RA Removing and installing/replacing lock fastener for right glovebox (with active
BMW AG - TIS
13.02.2013 15:24
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -