Z Series E85 Z4 3.0i (M54) ROADST
Installation:
Hydraulic lines, cable and Bowden cable must not be kinked and
clip in according to numbers on acoustic insulation lower section.
They must rest very closely on acoustic insulation.
Observe following notes on installation.
Installation:
Line and cable routing, hydraulic unit, front:
1.
Wiring harness, hydraulic unit
2.
Upper hydraulic line, left main support
3.
Cable ties
4.
Emergency release Bowden cable
5.
Hydraulic lines, right main support
6.
Lower hydraulic line, left main support
Installation:
Line and cable routing, hydraulic unit, rear:
1.
Emergency release Bowden cable
2.
Wiring harness, hydraulic unit
3.
Hydraulic lines, right main support
4.
Hydraulic lines, left main support
Close convertible top.
Disconnect plug connections (1).
Important!
Have a cloth ready to wipe away escaping oil.
Release banjo bolts (2) and (3) and remove lines.
Installation:
-
Blue/black cable on plug with red dot
-
Hose with hose labeling 12/14 on hydraulic unit
connection "12/14" (connection 2)
-
Hose with hose labeling "11/13" on other hydraulic unit
connection "11/13" (connection 3)
Note:
RA Removing and installing/replacing hydraulic unit for convertible top drive
BMW AG - TIS
16.02.2013 03:15
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -