Z Series E85 Z4 3.0i (M54) ROADST
Cut cable ties (1) from wiring harness holder only.
Installation:
Replace cable straps.
Feed hydraulic lines (2) out of convertible top strip.
Release screws (1) on cable holders.
Release snap ring from pin (2) and drive out pin.
Release screw (3).
Installation:
Insert screw (3) with Loctite.
Tightening torque 54 31 14AZ
.
Remove adhesive tape (4) from wiring harness.
RA Removing and installing/replacing complete hydraulic unit
BMW AG - TIS
16.02.2013 03:22
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -