bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 RA Removing And Installing Transmission (GS6-17BG) N52|Page 724 > < 10 RA Removing And Installing Transmission (GS6-17BG) N52|Page 722
Page 4
background image

Unscrew nuts (1).

Tightening torque:  22 32 3AZ

.

Unfasten screws (2).

Tightening torque:  22 32 4AZ

.

Remove cross member.

Remove propeller shaft from transmission.

Release center bearing.

Tie propeller shaft to one side.

Tasks are described in Removing propeller shaft.

Detach locking clip.

Pull shift rod (1) out of shift rod joint (2).

Installation:

Grease shift rod pin (3).

Grease,

 refer to BMW Service Operating Fluids.

RA  Removing and installing transmission (GS6-17BG) N52

BMW AG - TIS

15.02.2013  18:18

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

10 RA Removing And Installing Transmission (GS6-17BG) N52|Page 724 > < 10 RA Removing And Installing Transmission (GS6-17BG) N52|Page 722