Z Series E85 Z4 3.0i (N52) ROADST
Installation:
Do not pull out wire (4).
If necessary, turn shaft at square with open-end wrench upwards
slightly and slide wire (4) into bore.
If necessary, replace defective bearings (2).
Attach left/right bearings (2) correctly to shaft (1).
Opening on bearing (2) points downwards slightly.
Tighten screws (5) after fitting lid to specified torque.
Tightening torque 51 16 13AZ
.
RA Removing and installing/replacing lid on rear storage box
BMW AG - TIS
15.02.2013 23:07
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -